In the field
Work fronts, plant and installed infrastructure.
Approved field photography showing the operating environments and construction activities relevant to PRCD's services.
Capability in practice
One look across the work.
Pipeline, civil, site services, plant and aerial capture in a single collection. Filter by service area, or take in the full picture.
-
Pipeline work front, Central Queensland -
Excavation beneath conveyor infrastructure -
Floating suction line and dewatering -
Plant mobilisation to site -
UAV field deployment -
Village walkways after dark -
Butt fusion welding -
Haul road and access construction -
Mine-water pumping and dewatering -
Pontoon and walkway installation -
Aerial capture of pipeline interfaces -
Covered walkways and assembly areas -
Welding set-up and pipe delivery -
Detailed excavation in rock -
Site set-up for extended hours -
Pipe delivery and laydown coordination -
Water storage and earthworks capture -
Site office and amenity access -
Valve and fitting installation -
Clearing and site preparation -
Pressure control station -
Lifting and crane coordination -
Construction progress and plant overview -
Building pads and footings -
Pipe laying in trench -
Hardstand and pad construction -
Dewatering pump set -
Pipe delivery and offloading -
Trench and corridor condition capture -
Workshop pads and minor concrete works -
Watercourse crossing -
Water-retaining earthworks -
Managed discharge -
Pontoon lift and placement -
Rural site and access context -
Workshops, shelters and laydown facilities -
Backfill and reinstatement -
Bulk earthworks and dewatering -
Tanks and pump interfaces -
Work method briefing -
Roof and solar array inspection -
Pad preparation for site buildings -
Flow control assembly -
Services and utility trenching -
Actuated valve manifold -
PRCD on site, Central Queensland -
Environmental and coastline capture -
Metered service connections to site buildings -
Pressure testing -
Underground services installation -
Floating and suction lines -
Specialist UAV equipment deployment -
Buried services for site facilities -
Pipeline and valve station -
Structures and crossings -
Pump stations -
Ground-mounted solar array inspection -
Marker tapes over buried services -
Poly welding set-up -
Access roads and prepared workfronts -
Pump sets and field maintenance -
Industrial laydown and asset overview -
Site office, access and assembly areas -
Fabricated fittings and installation preparation -
Underground services and utilities -
Pipeline infrastructure on dam embankments -
Earthworks bench with plant on site -
Valve installation under isolation control -
Pump deployment and site support -
Trenched corridor and cut faces -
Temporary pipelines and valve systems -
Earthworks pad with working excavator -
Air valves and line fittings -
Water basin excavation -
Large-diameter pipe staged for installation -
Trenched corridor through spoil -
Electrofusion jointing in progress -
Corridor beside a watercourse -
Electrofusion fitting and welding leads -
Watercourse crossing -
Completed electrofusion joint -
Mine work area from the air -
Haul road across country -
Turning bench and spoil -
Cut face and erosion texture -
Spoil face and haul road -
Benched spoil and cut face -
Corridor beside rock cut -
Haul corridor through cleared ground
No photographs in this category yet.
Discuss a project
Send us the scope and site details.
Send the scope, site and programme. PRCD will confirm the delivery approach and what it would take to mobilise.
Discuss a project
0431 123 259
Available 7am to 7pm. Enquiries are answered within one business day.